Industrial painting

Ventherm industrial paint and drying booths

Complete engineered systems from a manufacturer with in-house development, documentation, automation and spare-parts support.

Ventherm industrial paint boothBane NOR rail paint facilityBladt heavy-industry coating facilitySiemens Gamesa wind-power paint facility
VENTHERM PROGRAMME

Complete painting technology — from preparation to an automated line

Ventherm engineers complete plants for rail, aerospace and defence, wind power, offshore and shipbuilding, agricultural machinery and heavy industry. The booth, drying, ventilation, filtration, transport, PLC and energy package are defined as one system around the product and process.

SPRAY & DRY

Paint and drying booths

Full-ceiling vertical airflow, controlled extraction, filtration and stable process conditions. Standard and custom solutions, including zones for extremely large components, aircraft paint docks and shipyards.

PROCESS ROOMS

Open zones and paint-mix rooms

Open-front spray boxes, paint preparation and mixing rooms, safe storage, ventilation and the ATEX concept are integrated with the complete process.

ROBOTICS

Robotic blasting and painting

Gantry, floor and in-line robots, 3D scanning and automatic path generation for large and variable geometries, delivering repeatable quality and process traceability.

MATERIAL FLOW

3D platforms, lifts and conveyors

Three-axis operator platforms, Power & Free conveyors, cranes and handling systems are engineered with the booth for safe access and greater capacity.

INTELLIGENT PLC CONTROL

Your booth on a phone, tablet or computer

The Ventherm PLC combines control and monitoring of temperature, pressure, air velocity, operating mode and system status. Operators use a clear digital panel or app, while authorised Ventherm technicians can access the system online for diagnostics and service.

  • PLC/HMI panel with a clear process overview
  • Control and monitoring through the Ventherm app
  • Alarms, recipes and data logging capability
  • Remote diagnostics and shorter service interventions
  • Pressure, temperature and air-velocity control
View the official PLC system →
MY BOOTH
20–25 °CPROCESS TEMPERATURE
PRESSURElive control
AIRFLOWVFD regulated
STATUSremote access
APP · HMI · PC
ENERGY-SAVING PACKAGE

Up to 85% heat recovery in a suitable configuration

The Energy-Saving Package is engineered together with the booth to reduce painting and drying costs without compromising process quality or safety.

≤ 85%heat recovery with cross-flow exchanger
VFDvariable-frequency control of every motor
LEDefficient process lighting
SMARTprogrammes matched to actual process demand

In very long booths, ventilation zones allow operation only in the required section; in a suitable project, consumption can be approximately one sixth of full-extraction operation.

Official Ventherm Energy-Saving Package →

Information required for engineering

Product dimensions and weight, material, coating type, expected capacity, cycle time, temperature regime, handling method, available utilities, space and local emission and safety requirements.

VENTHERM REFERENCE SOLUTIONS

From Rolls-Royce plants to trains, wind turbines and defence

References are not decoration — they show how Ventherm solves real dimensions, airflow, automation, handling and energy consumption.

RAILAEROSPACE & DEFENCEWIND POWEROFFSHORE & MARINEHEAVY INDUSTRY
Custom booths for large, demanding products
MARINE

Custom booths for large, demanding products

Rolls-Royce Marine facilities in Bergen and Tennfjord are among Ventherm's officially presented industrial-booth references.

Ventherm spray booths →
Aircraft paint docks and defence systems
AIRCRAFT & DEFENCE

Aircraft paint docks and defence systems

Zone-divided vertical ventilation for large aerospace components and Plug-and-Paint systems for Kongsberg Defence & Aerospace.

Kongsberg case →
10 air-handling units × 44,000 m³/h
RAIL

10 air-handling units × 44,000 m³/h

Ten Energy-Saving packages, heat recovery engineered to −40 °C, VFD control, 3D platforms and a paint-mix room.

Bane NOR case →
A complete rail-vehicle line
RAIL

A complete rail-vehicle line

Ten 25,000 m³/h units, ten Energy-Saving packages, 3D platforms and a paint-mixing room.

Swedtrac case →
Online monitoring and remote service
SMART RAIL

Online monitoring and remote service

Energy-Saving Package and advanced online monitoring and service controls, with technical equipment on a service platform above the booth.

Alstom project →
Two multi-zone booths
WIND POWER

Two multi-zone booths

Approximately 70% heat recovery, humidity control and roughly 70 tonnes of process equipment for exceptionally large components.

Siemens Gamesa case →
Robotic blasting and painting
ROBOTIC OFFSHORE

Robotic blasting and painting

Blastman robot, Ventherm painting robot, turnkey heavy-duty coating equipment and automatic programming for variable geometries.

Lamprell project →
Three-booth tunnel and blast room
COMPLETE PROCESS

Three-booth tunnel and blast room

Three spray/dry booths, Energy-Saving Package, blast room with scraper abrasive recovery and integrated washing.

Official case →
Ventherm video

Paint booths and systems in operation

Official Ventherm presentation of industrial solutions, ventilation and automation.

Technical enquiry

Tell us about the part, process and required result

We define the next technical steps from your product, capacity, facility and utility data.

Send an enquiry